Ryan S.
Ryan S.
Hello, I have the impression that for all contracts deployed with a proxy, the "2Step" procedure implemented in the implementation contract (if present) loses its interested if the proxy admin...
It is only an addition in BaseModule, but it increases the contract code size of +0.296. It is not a lot, but we are too close of the maximum size...
For the drag along, currently, you can manage the vote and the sell-offline and than burn/mint the corresponding token. A part to reduce gas fee, it is not really useful...
Preferable to have only one CMTAT version
In pause since we are limited in the size of the contracts
A report performed with Slither is now available in the doc
A report with mythril is also available now
Remove the TOC from the readme
Add docgen inside the doc + format the code to the natspec comment
Done