Heather Greer Klein

Results 46 issues of Heather Greer Klein

From release plan spreadsheet Estimate from release plan: 8 hours Expressing interest: none Depends on "Scripts & Processes" endpoint Related Angular ticket: https://github.com/DSpace/dspace-angular/issues/774

interface: REST API v7
tools: export
Difficulty: medium
medium priority
e/8

This is a duplicate of [DS-3589](https://jira.lyrasis.org/browse/DS-3589) Estimate from release plan: 12 hours Expressing interest: none The Next Generation Repositories Working Group from COAR has recently released the first draft of...

interface: REST API v7
Difficulty: low
e/48

From the release spreadsheet Estimate from release plan: TBD Expressing interest: none No details added; note that a volunteer is needed. Frontend ticket: https://github.com/DSpace/dspace-angular/issues/815

interface: REST API v7
component: Discovery
e/48
component: controlled vocabulary

As a repository Administrator, I should have the option to receive an email notification whenever a new account is created in the repository. This should be another option in my...

From HykuDirect piloters: As a depositor, I should be able to easily view details from rightsstatement.org regarding each of the potential rights statements from the submission form so that I...

pilot

From HykuDirect piloters: As a repository admin who is configuring my repository through the UI, I need to be able to add custom rights statements to be used in the...

pilot

From HykuDirect piloters: As a repository admin who is configuring my repository through the UI, I need to be able to specify which rights statements should be listed in the...

pilot

From release plan spreadsheet Estimate from release plan: 2 hours Expressing interest: none Links should appear on Item pages when enabled. Estimate is for just displaying embedded links if configuration...

Difficulty: Low
component: Discovery
low priority
e/2

From release plan spreadsheet Estimate from release plan: 50 hours Expressing interest: none Requires rendering workflow actions dynamically

Difficulty: High
component: workflow
e/50
claimed: Atmire

From release plan spreadsheet Estimate from release plan: 16 hours Expressing interest: none Likely should be redesigned to use the scripts & processes endpoint Depends on REST ticket https://github.com/DSpace/DSpace/issues/2842

Difficulty: Medium
tools: export
medium priority
e/8