Improvement/zenko 4713 tests on put obj no version
This PR aims to add a test case on the dmfFeature , for the put of an existing object in the cold lolcation in the hot one , in the test we make sure that dmf deletes the already existing object in the cold storage , before the hot location object is transitioned thus avoiding the creation of orphans.
Linked issue : https://scality.atlassian.net/browse/ZENKO-4713
Hello benzekrimaha,
My role is to assist you with the merge of this
pull request. Please type @bert-e help to get information
on this process, or consult the user documentation.
Available options
| name | description | privileged | authored |
|---|---|---|---|
/after_pull_request |
Wait for the given pull request id to be merged before continuing with the current one. | ||
/bypass_author_approval |
Bypass the pull request author's approval | :star: | |
/bypass_build_status |
Bypass the build and test status | :star: | |
/bypass_commit_size |
Bypass the check on the size of the changeset TBA |
:star: | |
/bypass_incompatible_branch |
Bypass the check on the source branch prefix | :star: | |
/bypass_jira_check |
Bypass the Jira issue check | :star: | |
/bypass_peer_approval |
Bypass the pull request peers' approval | :star: | |
/bypass_leader_approval |
Bypass the pull request leaders' approval | :star: | |
/approve |
Instruct Bert-E that the author has approved the pull request. | :writing_hand: | |
/create_pull_requests |
Allow the creation of integration pull requests. | ||
/create_integration_branches |
Allow the creation of integration branches. | ||
/no_octopus |
Prevent Wall-E from doing any octopus merge and use multiple consecutive merge instead | ||
/unanimity |
Change review acceptance criteria from one reviewer at least to all reviewers |
||
/wait |
Instruct Bert-E not to run until further notice. |
Available commands
| name | description | privileged |
|---|---|---|
/help |
Print Bert-E's manual in the pull request. | |
/status |
Print Bert-E's current status in the pull request TBA |
|
/clear |
Remove all comments from Bert-E from the history TBA |
|
/retry |
Re-start a fresh build TBA |
|
/build |
Re-start a fresh build TBA |
|
/force_reset |
Delete integration branches & pull requests, and restart merge process from the beginning. | |
/reset |
Try to remove integration branches unless there are commits on them which do not appear on the source branch. |
Status report is not available.
Incorrect fix version
The Fix Version/s in issue ZENKO-4713 contains:
- None
Considering where you are trying to merge, I ignored possible hotfix versions and I expected to find:
-
2.7.54 -
2.8.34 -
2.9.8
Please check the Fix Version/s of ZENKO-4713, or the target
branch of this pull request.
Incorrect fix version
The Fix Version/s in issue ZENKO-4713 contains:
- None
Considering where you are trying to merge, I ignored possible hotfix versions and I expected to find:
-
2.7.55 -
2.8.35 -
2.9.9
Please check the Fix Version/s of ZENKO-4713, or the target
branch of this pull request.
Incorrect fix version
The Fix Version/s in issue ZENKO-4713 contains:
- None
Considering where you are trying to merge, I ignored possible hotfix versions and I expected to find:
-
2.10.0 -
2.7.55 -
2.8.35 -
2.9.9
Please check the Fix Version/s of ZENKO-4713, or the target
branch of this pull request.
/create_integration_branches
Integration data created
I have created the integration data for the additional destination branches.
- this pull request will merge
improvement/ZENKO-4713-tests-on-putObjNoVersionintodevelopment/2.7 -
w/2.8/improvement/ZENKO-4713-tests-on-putObjNoVersion will be merged into
development/2.8 -
w/2.9/improvement/ZENKO-4713-tests-on-putObjNoVersion will be merged into
development/2.9 -
w/2.10/improvement/ZENKO-4713-tests-on-putObjNoVersion will be merged into
development/2.10
The following branches will NOT be impacted:
-
development/2.5 -
development/2.6
You can set option create_pull_requests if you need me to create
integration pull requests in addition to integration branches, with:
@bert-e create_pull_requests
The following options are set: create_integration_branches
Waiting for approval
The following approvals are needed before I can proceed with the merge:
-
the author
-
2 peers
The following options are set: create_integration_branches
@bert-e create_pull_requests
Integration data created
I have created the integration data for the additional destination branches.
- this pull request will merge
improvement/ZENKO-4713-tests-on-putObjNoVersionintodevelopment/2.7 -
w/2.8/improvement/ZENKO-4713-tests-on-putObjNoVersion will be merged into
development/2.8(pull request #2107) -
w/2.9/improvement/ZENKO-4713-tests-on-putObjNoVersion will be merged into
development/2.9(pull request #2108) -
w/2.10/improvement/ZENKO-4713-tests-on-putObjNoVersion will be merged into
development/2.10(pull request #2109)
The following branches will NOT be impacted:
-
development/2.5 -
development/2.6
Follow integration pull requests if you would like to be notified of build statuses by email.
The following options are set: create_pull_requests, create_integration_branches
Waiting for approval
The following approvals are needed before I can proceed with the merge:
-
the author
-
2 peers
The following options are set: create_pull_requests, create_integration_branches
/approve
Build failed
The build for commit did not succeed in branch w/2.8/improvement/ZENKO-4713-tests-on-putObjNoVersion.
The following options are set: approve, create_pull_requests, create_integration_branches
Build failed
The build for commit did not succeed in branch w/2.9/improvement/ZENKO-4713-tests-on-putObjNoVersion.
The following options are set: approve, create_pull_requests, create_integration_branches
In the queue
The changeset has received all authorizations and has been added to the relevant queue(s). The queue(s) will be merged in the target development branch(es) as soon as builds have passed.
The changeset will be merged in:
-
:heavy_check_mark:
development/2.7 -
:heavy_check_mark:
development/2.8 -
:heavy_check_mark:
development/2.9 -
:heavy_check_mark:
development/2.10
The following branches will NOT be impacted:
-
development/2.5 -
development/2.6
There is no action required on your side. You will be notified here once the changeset has been merged. In the unlikely event that the changeset fails permanently on the queue, a member of the admin team will contact you to help resolve the matter.
IMPORTANT
Please do not attempt to modify this pull request.
- Any commit you add on the source branch will trigger a new cycle after the current queue is merged.
- Any commit you add on one of the integration branches will be lost.
If you need this pull request to be removed from the queue, please contact a member of the admin team now.
The following options are set: approve, create_pull_requests, create_integration_branches
I have successfully merged the changeset of this pull request into targetted development branches:
-
:heavy_check_mark:
development/2.7 -
:heavy_check_mark:
development/2.8 -
:heavy_check_mark:
development/2.9 -
:heavy_check_mark:
development/2.10
The following branches have NOT changed:
-
development/2.5 -
development/2.6
Please check the status of the associated issue ZENKO-4713.
Goodbye benzekrimaha.