stackdriver-tools icon indicating copy to clipboard operation
stackdriver-tools copied to clipboard

Add stress test suite to concourse pipeline

Open mattysweeps opened this issue 7 years ago • 0 comments

It is critical the Stackdriver-Nozzle works well with high volumes of logs. A stress test job should be added to the concourse pipeline.

  • spins up X CF apps, each which log M/N bytes/message
  • monitor and record VM health metrics for the Nozzle
  • measure percentage of dropped logs
  • measure log message delay
  • measure Nozzle error count
  • record all stats into a historical DB for later (trend) analysis

mattysweeps avatar Jan 22 '19 18:01 mattysweeps