PathOfBuilding
PathOfBuilding copied to clipboard
Filtering by "Per Point" on Power Report does not calculate passives that can be allocated without being connected to tree.
Check for duplicates
- [X] I've checked for duplicate issues by using the search function of the issue tracker
Is your feature request related to a problem?
Currently, when sorting by Per Point on a power report, passives that can be allocated without being connected to the tree are calculated as if you pathed to them, regardless of if you need to or not.
Describe the solution you'd like
Ideally, when sorting by Per Point on a power report, passives that can be allocated without being connected to the tree would show up with a distance of 1 point.
Describe alternatives you've considered
As far as I'm aware, there is no current similar functionality other than manually hovering over every passive that can be allocated without being connected to the tree. (Thread of Hope, Intuitive Leap, Impossible Escape, etc)
Additional context
No response